Independent advice is only worth what it saves or protects. These are recent projects where our team specified, tendered, audited or assessed lift and escalator work for owners, hotel operators, body corporates and insurers. Every figure comes from the project’s tender, contract or report.
Featured projects
Oracle Tower Two
The building: four high-rise passenger lifts serving 42 levels at 3.5 m/s.
The problem: a sprinkler leak on Level 41 ran water into all four lift shafts. The repair quote came to $370,220.
Our role: engaged by loss adjuster McLarens. We inspected every shaft with the maintainer and separated the parts the water actually reached from the ones it didn’t.
Status: final report issued.
The Star Treasury car park
The building: three car park lifts, including a duplex pair with a bottom machine room.
The problem: water from a burst water main in February 2025 damaged the lifts. Two of them lost their controllers, gearboxes and motors. Full replacement of all three lifts was first proposed at $1,335,000.
Our role: insurance assessment, then a targeted repair specification, a tender to six contractors and contract administration for The Star Entertainment QLD.
Status: works in progress.
Rivage Royale
The building: a residential complex with six passenger lifts.
The problem: our 2024 condition audit found ageing motors, controllers and drives that needed a staged modernisation.
Our role: specification, tender, tender review, an AS 2124 contract, and Superintendent for the body corporate during the works.
Status: modernisation under way.
Sheraton Grand Sydney Hyde Park
The building: a city hotel with eight passenger lifts, up to 25 stops.
The problem: early-1990s controls and drives, now over 30 years old, kept running on salvaged parts.
Our role: one specification covering all eight lifts plus a maintenance agreement, tendered to all four major manufacturers, then tender review.
Status: recommendation issued to the owners.
The Towers, Elizabeth Quay
The building: a residential strata tower with six lifts (three high-rise, two machine-room-less and a platform lift), installed around 2018.
The problem: the owners needed a maintenance contract with teeth, and someone independent to check it was being met.
Our role: we wrote a fully comprehensive maintenance agreement with KPIs, tendered it to three contractors and negotiated down the after-hours call-out fee. We have audited the contractor every year since.
Status: ongoing annual audits.
Sofitel Brisbane Central
The building: nine high-speed lifts (3.5 m/s, up to 26 levels) and eight escalators.
The problem: the hotel needed a new comprehensive maintenance contract on terms that protect the owner.
Our role: site inspection, our own maintenance agreement, the tender and post-tender negotiation.
Status: recommendation issued.
More recent projects
- Novotel Darwin Airport, NT (Accor): condition audit of three lifts that logged 146 call-outs in 12 months. We showed the $184,612 mid-life proposal wouldn’t reset their life, and budgeted the real options.
- Peppers Waymouth, Adelaide SA (Accor): audit of four 55-year-old lifts. We recommended a $1.4M–$1.8M modernisation rather than full replacement.
- Novotel Perth Langley, WA (Accor): audit of four lifts and a dumbwaiter. Our targeted upgrade scope came to $1.53M, against a $2.46M full-scope budget.
- Peppers Beacon, Queenstown NZ (Accor): workmanship audit of four new lifts. 22 of 29 defects closed by the installer so far.
- The Ritz-Carlton Perth, WA: annual independent audits of seven lifts, including a line-by-line review of the maintainer’s chargeable invoices.
- North Lakes Town Centre, QLD (Comiskey Group): vertical transport design and procurement for 7 lifts, 4 escalators and 4 travelators, including a hotel traffic study.
- Peppers Soul and Soul Boardwalk, Surfers Paradise QLD: modernisation design and tender for 8 tower lifts, plus 4 escalators and 4 lifts in the retail podium.
- Novotel Melbourne on Collins, VIC (Accor): brought in to get a stalled eight-lift modernisation contract moving again.
- Sofitel Gold Coast and Sofitel Sydney Wentworth: upgrade specification, tender schedules and ongoing consultancy.
Who we work with
Accor
Sofitel
Novotel
ibis
Pullman
Marriott
Sheraton
Hilton
IHG Hotels & Resorts
Holiday Inn
Radisson Hotels
Wyndham Hotels & Resorts
CBRE
JLL
Savills
Colliers
Dexus
Investa
Cygnet West
Formplus
Mosaic Property Group
Kokoda Property
Queensland Rail
City of Gold Coast
Tweed Shire Council
Accor
Sofitel
Novotel
ibis
Pullman
Marriott
Sheraton
Hilton
IHG Hotels & Resorts
Holiday Inn
Radisson Hotels
Wyndham Hotels & Resorts
CBRE
JLL
Savills
Colliers
Dexus
Investa
Cygnet West
Formplus
Mosaic Property Group
Kokoda Property
Queensland Rail
City of Gold Coast
Tweed Shire Council
We are engaged by the people who own, manage and insure the buildings — body corporates and committees, hotel operators and asset managers, government and transport authorities, loss adjusters and insurers. We are not owned by, and do not sell for, any lift company, so the advice you get is ours alone.
Since 2023 we have worked across more than 250 projects in Queensland, New South Wales, Victoria, Western Australia, South Australia, the Northern Territory and New Zealand. The brands below operate in buildings we have audited, tendered, modernised or managed.
Hotels and resorts
- Sofitel
- Novotel
- Pullman
- ibis and ibis Styles
- Mantra
- Peppers
- Art Series
- JW Marriott
- Sheraton Grand
- The Ritz-Carlton
- Hilton
- Holiday Inn
- Radisson
- Wyndham
- Mondrian
- QT
- Fraser Suites
- Ultiqa
Property and asset management
- CBRE
- JLL
- Savills
- Colliers
- Cygnet West
- First Asset Management
- Dexus
- Goodman
- Investa
- Network Pacific
- Care Park
- Destination Gold Coast
- Pacific Fair
- Smith Collective
- Gold Coast Turf Club
- Treasury Brisbane
- Paradise Centre and Circle on Cavill
- Caboolture Square, Hinkler Central and Drayton Shopping Centre
Developers, builders and investors
- Hutchinson Builders (Hutchies)
- Formplus
- Huayu Group
- Far East Consortium
- Salter Brothers
- YTL
- Kokoda Property
- Holm Developments
- Mosaic Property Group
- Comiskey Group
- Mayd Group
Government, transport and education
- Australian Federal Police
- Queensland Rail
- Keolis Downer (G:link)
- City of Gold Coast
- Tweed Shire Council
- Queensland state schools
- Redeemer Lutheran College
- Suncoast Christian College
- Blayney High School
Community, care and insurance
- Ozcare
- RFBI
- Ballina RSL Club
- Hervey Bay RSL
- Chubb
- Sedgwick
- McLarens
- Residential body corporates across the Gold Coast, Brisbane, Sydney, Melbourne and Perth
Logos and brand names are the property of their respective owners and are shown to identify buildings and portfolios The Lift Consultancy has worked on. Their use does not imply any endorsement or partnership.