It confirms the machine matches its registered design. It specifically excludes the building interface under the NCC. The data sheet in the middle is the part worth keeping for the life of the asset.

It confirms the machine matches its registered design. It specifically excludes the building interface under the NCC. The data sheet in the middle is the part worth keeping for the life of the asset.

Most agreements set out the contractor obligations. The owner obligations are the ones that decide arguments later. Here is the full list, and what to check before you sign.

The DBP scheme regulates the interface between the lift and the building, not the lift. If the interface does not change, there is nothing to declare. But the plant regime is a separate question.

An alteration that may affect health or safety has to be registered. Here are the ten parameters that decide it, and the pre-2001 trap that catches older lifts.

Emergency lifts are not labelled and are not required to be. In a triplex the answer is often two of them, decided by which storeys each one serves. Here is how to work it out and what to put on the wall.

Sprinklers in the well are allowed, but only in a sequence that shuts the lift down first. In a building over 12 metres that collides with fire service operation, and somebody has to resolve it.